Yalama-Sumgayıt (174 km; Sumgayıt-Yalama (174 km); demolition of old two-lane road, construction of upper structure of two-lane road with new materials, demolition of 236 units intersections and replace with new ones
Customer: TOO “İntegra Construction KZ”
Type of work and infrastructure covering the work: Railway and new building
Main work volumes:
- Length of road (km) -0
- Length of demolished road (km) -60
- Volume of ballast (m3)-0
- Volume of subballast (m3) -0
- Ground works (m3) -0
- 6. Number of pointsman -20
Execution period (start and end dates): 2020