Construction of railway at Sumgayıt Carbamide Plant with 5984 pm length
Customer: “ADVANCED INDUSTRIAL SOLUTIONS” LLC
Type of work and infrastructure covering the work: Railway and new building
Main work volumes:
- Length of road (km) – 6
- Length of demolished road (km) -new
- Volume of ballast (m3)-9000
- Volume of subballast (m3) -4800
- Ground works (m3) -12000
- Number of pointsman -16
Execution period (start and end dates): 2019