Skip to content
  • +99412 412 50 59
Kontur-ALS Logo
Dəstək
  • About us
  • Our Mission
  • Projects
  • Photo Gallery
  • Reports
    • Management reporting
    • Financial report
  • Contact us
  • EN
    • AZ AZ
    • EN EN
    • RU RU

Construction of a 275 pm railway under the project “Design and reconstruction of the R-7 highway, Kh.Z. Tagiyev-Sumgayit for 4-lane traffic”


Customer: 17№-li Xüsusi Təyinatlı Yol İstismarı LLC
Type of infrastructure and work performed: Railway construction
Main scope of work:

  1. Length of paved road (pm) – 275 pm/road
  2. Ballast volume – 410 m3

Duration of work (start and completion dates): 2022

Post navigation

“Reconstruction of the existing bridge over the Kura River on the Alyat-Horadiz-Agband railway line and design and construction of a new bridge parallel to it” – construction of the 597 pm railway and installation of 11 sets of turnouts
Laying a railway 200 pm under the project “Design and reconstruction of the R-7 highway, Kh.Z.Tagiyev-Sumgayit for 4-lane traffic”

+99412 412 50 59

+99450 209 43 70

+99450 209 43 71

info@kontur-als.az

office@kontur-als.az

09:00-18:00


FreeCurrencyRates.com

© 2020

Kontur Arxitektura | Layihə-Sənaye.
  • By pLum

Form

    WhatsApp: +994502094370