Construction of tracks 200 pm m/d in the area of the sunken railway owned by LLC “Experimental Industrial Plant of the National Academy of Sciences of Azerbaijan”
Customer: Azoil Industry LLC
Type of infrastructure and work covered by the work: Railway construction
Main scope of work:
- Length of paved road (pm) – 200 pm/road
- Ballast volume (m3) – 400
Duration of work (start and completion dates): 2021