Demolition of intact buildings on the territory of the Khachmaz logistics center, demolition of underground basements, backfilling, preparation of the soil foundation of railway tracks under construction, provision of materials suitable for construction, construction of the upper structure of the track (rails, sleepers, etc.), installation of turnouts, preparation of the foundation of the place where the platform will be built and erected, installation of a drainage system for drainage of rain and storm water, as well as construction of other engineering and technical facilities
Customer: GREEN LOGISTICS LLC
Type of infrastructure and work covered by the work: Railway construction
Main scope of work:
- Length of paved road (pm) – 3299 pm/road
- Length of dismantled road (km) – 0
- Ballast volume (m3) – 6750
- Sub-ballast volume (m3) – 7740
- Earthwork (m3) – 3665
Duration of work (start and completion dates): 2021