12877 p.m. on the 1st main track of Jalilabad station, Jalilabad-Masally and Krymzikend-Jalilabad railways. repair work of a long railway track
Customer: Closed Joint Stock Company “Azərbaycan Dəmir Yolları”
Type of infrastructure and work covered by the work: Repair of railway tracks
Main scope of work:
- Length of dismantled road (lm) – 12877 pm/road
- Length of paved road (pm) – 12877 pm/road
- Ballast volume (m3) – 28329
Duration of work (start and end dates): 2020