Construction of a 300 pm road and 2 sets of turnouts from semi-useful materials for the reconstruction of the Baku Hovsan Sea Trade Port
Customer: OJSC “Bakı Hövsan Beynəlxalq Ticarət Dəniz Limanı”
Type of infrastructure and work covered by the work: Railway construction
Main scope of work:
- Length of paved road (pm) – 300 pm/road
- Ballast volume (m3) – 600
Duration of work (start and completion dates): 2021