Design, supply and construction and installation works for the restoration of the Sumgait-Yalama railway line (LOT 1, LOT 2)


Customer: “Kolin İnşaat Turizm Sanayi və Ticaret A.S.” Representative office in the Republic of Azerbaijan
Type of infrastructure and work performed: Railway construction
Main scope of work:

  1. Dismantling works
  2. Length of paved road (pm) – 348000 pm/road
  3. Number of switches – 226 sets

Duration of work (start and end dates): 2021-2023