Final design and construction works for the reconstruction of Repair Depot in Ganja, construction of electrical substation, alarm works, construction of railway, installation and project works of contact network


Customer: “6th Floor” Independent Company LLC
Type of work and infrastructure covering the work:
Railway and new building
Main work volumes:

  1. Length of road (km) -3,1
  2. Length of demolished road (km) -0,25
  3. Volume of ballast (m3)-7200
  4. Volume of subballast (m3) –
  5. Ground works (m3) –
  6. Number of pointsman -19

Execution period (start and end dates): 2018-2020

Post navigation

Demolition of 37 km old one- lane road of Saranja-Garadagh, soil deposit preparation for two-lane road, construction of forced devices, construction of upper structure of two-lane road with new materials, all works for the establishment project of communication, contact network and signaling infrastructure
Design of Socar Polymer Plant and carrying out Compiler control

+99412 412 50 59

+99450 209 43 70

+99450 209 43 71

info@kontur-als.az

office@kontur-als.az

09:00-18:00


Currency Converter
AZN - Azerbaijani manat m.
TRY - Turkish lira ₺
USD - United States dollar $
RUB - Russian ruble ₽
EUR - Euro €
i
May 19, 2025 04:15:05
FreeCurrencyRates.com

© 2020

Kontur Arxitektura | Layihə-Sənaye.
  • By pLum

Form

    WhatsApp: +994502094370