Final design and construction works for the reconstruction of Repair Depot in Ganja, construction of electrical substation, alarm works, construction of railway, installation and project works of contact network
Customer: “6th Floor” Independent Company LLC
Type of work and infrastructure covering the work: Railway and new building
Main work volumes:
- Length of road (km) -3,1
- Length of demolished road (km) -0,25
- Volume of ballast (m3)-7200
- Volume of subballast (m3) –
- Ground works (m3) –
- Number of pointsman -19
Execution period (start and end dates): 2018-2020