12877 p.m. on the 1st main track of Jalilabad station, Jalilabad-Masally and Krymzikend-Jalilabad railways. repair work of a long railway track
On measures related to the design and construction of the Barda-Agdam railway line” by Decree of the President of the Republic of Azerbaijan dated November 24, 2020 No. 2305 Design and construction of the Barda-Agdam railway line with a total length of 45 km
Demolition of intact buildings on the territory of the Khachmaz logistics center, demolition of underground basements, backfilling, preparation of the soil foundation of railway tracks under construction, provision of materials suitable for construction, construction of the upper structure of the track (rails, sleepers, etc.), installation of turnouts, preparation of the foundation of the place where the platform will be built and erected, installation of a drainage system for drainage of rain and storm water, as well as construction of other engineering and technical facilities
Construction of a 300 pm road and 2 sets of turnouts from semi-useful materials for the reconstruction of the Baku Hovsan Sea Trade Port
Construction of tracks 200 pm m/d in the area of the sunken railway owned by LLC “Experimental Industrial Plant of the National Academy of Sciences of Azerbaijan”
Design, supply and construction and installation works for the restoration of the Sumgait-Yalama railway line (LOT 1, LOT 2)
Dismantling work in the dry cargo port of Zykh, construction of the 950 pm railway, installation of 3 sets of turnouts
Laying a railway 200 pm under the project “Design and reconstruction of the R-7 highway, Kh.Z.Tagiyev-Sumgayit for 4-lane traffic”
Construction of a 275 pm railway under the project “Design and reconstruction of the R-7 highway, Kh.Z. Tagiyev-Sumgayit for 4-lane traffic”