Laying a railway 200 pm under the project “Design and reconstruction of the R-7 highway, Kh.Z.Tagiyev-Sumgayit for 4-lane traffic”
Customer: 15№-li Xüsusi Təyinatlı Yol İstismarı LLC
Type of infrastructure and work performed: Railway construction
Main scope of work:
- Length of paved road (pm) – 200 pm/road
- Ballast volume – 300 m3
Duration of work (start and completion dates): 2022