On measures related to the design and construction of the Barda-Agdam railway line” by Decree of the President of the Republic of Azerbaijan dated November 24, 2020 No. 2305 Design and construction of the Barda-Agdam railway line with a total length of 45 km
Customer: Closed Joint Stock Company “Azərbaycan Dəmir Yolları”
Type of infrastructure and work performed: Railway, design and new construction
Main scope of work:
- Axle length of the constructed road (km) – 47.1
- Length of dismantled road (km) – 17,514
Excavation:
- Vegetation layer – 92228 m3
- Excavations – 268928 m3
- Filling – 902154 m3
- Subballast – 74909 m3
- Ballast – 108988 m3
- Number of travelers – 34
Seris Road:
- Vegetation layer – 83966 m3
- Excavations – 15015 m3
- Filling – 288690 m3
Construction of stations:
- Tazakend
- Kocherli
- Barda
Duration of work (start and completion dates): 2020 (ongoing)