Demolition of 37 km old one- lane road of Saranja-Garadagh, soil deposit preparation for two-lane road, construction of forced devices, construction of upper structure of two-lane road with new materials, all works for the establishment project of communication, contact network and signaling infrastructure
Customer: “RAILWAYSERVICE” LLC
Type of work and infrastructure covering the work: Railway and new building
Main work volumes:
- Length of road (km) -6
- Length of demolished road (km) -35
- Volume of ballast (m3)-12000
- Volume of subballast (m3) -8400
- Ground works (m3) -58732
- Number of pointsman -2
Execution period (start and end dates): 2020