Skip to content
  • +99412 412 50 59
Kontur-ALS Logo
Dəstək
  • About us
  • Our Mission
  • Projects
  • Photo Gallery
  • Reports
    • Management reporting
    • Financial report
  • Contact us
  • EN
    • AZ AZ
    • EN EN
    • RU RU

Work on vertical planning and demolition at stage I for the purpose of construction of the rural settlement of Khidirly in Agdam region


Customer: Körpü-Bina-Tikinti LLC
Type of infrastructure and work performed: Vertical planning and demolition work
Main scope of work:

  1. 37 ha Demolition,
  2. Excavations – 550,000 m3
  3. Pouring work – 600,000 m3

Duration of work (start and end dates): 08/28/2023 (ongoing)

Post navigation

Construction of 1533 pm road at Charkhi station with semi-usable materials (Project and construction)
“Reconstruction of the existing bridge over the Kura River on the Alyat-Horadiz-Agband railway line and design and construction of a new bridge parallel to it” – construction of the 597 pm railway and installation of 11 sets of turnouts

+99412 412 50 59

+99450 209 43 70

+99450 209 43 71

info@kontur-als.az

office@kontur-als.az

09:00-18:00


FreeCurrencyRates.com

© 2020

Kontur Arxitektura | Layihə-Sənaye.
  • By pLum

Form

    WhatsApp: +994502094370