Yalama-Sumgayıt (174 km; Sumgayıt-Yalama (174 km); demolition of old two-lane road, construction of upper structure of two-lane road with new materials, demolition of 236 units intersections and replace with new ones


Customer: TOO “İntegra Construction KZ”
Type of work and infrastructure covering the work:
Railway and new building
Main work volumes:

  1. Length of road (km) -0
  2. Length of demolished road (km) -60
  3. Volume of ballast (m3)-0
  4. Volume of subballast (m3) -0
  5. Ground works (m3) -0
  6. 6. Number of pointsman -20

Execution period (start and end dates): 2020